REAL PROPERTYNothing Dropped

The Sweep Family · Sweep 03

The roof & envelope sweep — five stops, nothing dropped

A building's envelope is the argument it makes against the weather, every day, unobserved. The book rates it from a desk. This sweep rates it from the roof and the grade line: drainage first, flashing second, and every hole in the envelope counted against the record.

Walk it virtually →

The Method

Five stops, worked in order

Work it in order: the roof field, the flashing that guards its edges, the walls, and the penetrations — then the close-out. At every stop: what to look at, what good looks like, and what to write down. Take the printable checklist up the ladder with you — and get the reps first in the Roof & Envelope Virtual Walk, where four catches wait on a teaching roof.

Stop 1 of 5

The Roof Field

What to look at

Seams, blisters, patches — and the low corners. When did it last rain? A sound roof forgets rain within about 48 hours. Every drain gets eyes on it: strainer present, bowl clear, water path open.

What good looks like

Membrane tight and dry. No ponding past 48 hours. Every drain clear enough to draw a whirlpool.

What to write down

Ponding with size, location, and days since rain — and a photo with a scale reference. Drain state per drain. Condition rated by the worst honest answer, reason attached.

Stop 2 of 5

Flashing & Parapets

What to look at

Where metal meets membrane: counterflashing seated against the wall, joints sealed, caps sound. Read every 'repair' skeptically — a smear of cement over a split is a patch with a season in it, not a repair.

What good looks like

Flashing tight along every run, joints sealed, no displaced metal, no surface patches standing in for repairs.

What to write down

Run by run — parapets are rated by their worst run, with the run named. Booked repairs verified or called out, with contrast photos: the failed run and a sound one.

Stop 3 of 5

Exterior Walls

What to look at

All four elevations, walked — not the two the parking lot shows you. Joints and pointing, step-cracking over lintels, spalls at the grade line, and the splash zone where the wall meets the dirt.

What good looks like

Masonry sound, joints full, no cracking that maps a movement, grade shedding water away from the wall.

What to write down

One photo per elevation, tied to the record. Any crack with its location and direction. Condition per elevation before the envelope gets one word.

Stop 4 of 5

Windows, Doors & Penetrations

What to look at

Count the doors against the book, out loud, elevation by elevation. Window seals, sills pitched to shed, weep holes open — never caulked shut. Every vent, conduit, and bibb the book lists, found and sealed.

What good looks like

The count on the ground equals the count in the book. Seals intact, weeps open, every penetration flashed and sealed.

What to write down

The count itself, stated as a count: 'five doors stand; the book lists four.' Any unbooked penetration with its photo, wide and close. Workmanship judged separately from the record.

Stop 5 of 5

The Close-Out Lap

What to look at

From the ground, one full circuit with the notebook open: every difference between the envelope and the record. Roof areas you couldn't safely reach get named as unreached.

What good looks like

Every difference on paper with a location and a photo. Water paths traced from roof to grade with no gaps in the story.

What to write down

The difference list before you leave the site. The envelope's verdict in one line — and the unreached list stated as plainly as the cleared list.

The printable checklist — The Roof & Envelope Sweep

Carry it on paper. Check a box only when your eyes — not the book — say it's true.

SiteDateSwept by

Roof Field

  • Seams, blisters, and patches walked, not glanced at
  • Low corners checked; days since last rain noted
  • Every drain inspected — strainer and bowl
  • Ponding photographed with a scale reference

Flashing & Parapets

  • Counterflashing checked against the wall, every run
  • Booked repairs verified at their edges
  • Runs rated individually; worst run named
  • Contrast photos: failed run and sound run

Exterior Walls

  • All four elevations walked
  • Joints, lintels, and grade line checked
  • One photo per elevation
  • Cracks located and described, not just counted

Windows, Doors & Penetrations

  • Doors counted against the book, out loud
  • Seals, sills, and weep holes checked
  • Every booked penetration found and checked sealed
  • Unbooked penetrations photographed wide and close

Close-Out Lap

  • Full circuit walked with the notebook open
  • Difference list written before leaving
  • Unreached roof areas named
  • Water path traced roof-to-grade with no gaps

Close-out rule, every sweep: every difference between the ground and the book is written down before you leave — and anything you couldn't reach is named as unreached, never silently cleared.